Which set of steps is the recommended cabling sequence with FS1-2 hardware components?
(A) 1. Controller 1: Install CMA, plug and route cables Power first, Ethernet,SASController Interconnects, SAS Controller to Strings and Front End Network Connections respectively. 2.Controller 2: Same as above. 3.DEs per string sequence. 4.Pilot 1: Install CMA, plug al cablesand route them Power first, Ethernet Last. 5.Pilot 2: Same as above.
(B) 1. Pilot 1: Install CMA, plug all cables,and route them Power first, Ethernet last. 2.Pilot 2: Same as above. 3.DEs per string sequence. 4.Controller 1: Install CMA, plug and route cables Power first, Ethernet, SAS Controller Interconnects, SAS Controller to Strings, and Front End Network Connections respectively. 5.Controller 2: Same as above.
(C) 1. Controller 1: Install CMA, plug and route cablesPower first, Ethernet, SAS Controller Interconnects, SAS Controller to Strings, and Front End Network Connections respectively. 2.Controller 2: Same as above. 3.Pilot 1: Install CMA, plug all cables, and route them Power first, Ethernet last. 4.Pilot 2: Same as above. 5. DEs per string sequence.
(D) 1. Pilot 1: Install CMA, plug all cables, and route them Power first, Ethernet Last. 2.Pilot 2: Same as above. 3.Controller 1: Install CMA, plug and route cables Power first, Ethernet, SAS Controller Interconnects, SAS Controller to Strings and Front End Network Connections respectively. 4.Controller 2: Same as above. 5.DEs per string sequence.