Refer to the exhibit. A client is configuring a new Cisco ACI fabric. All VLANs will be extended during the migration phase using the VPC connections on leaf switches 3, 4 and leaf switches 5,
6 toward the legacy network. The migration phase has these requirements:
- The legacy switches must be able to transfer BPDUs through the ACI
fabric.
- If the legacy switches fail to break a loop, Cisco ACI must break the loop.
Which group settings must be configured on VPC interface policy groups ipg_vpc-legacy_1 and ipg_vpc-legacy_2 to meet these requirements?
6 toward the legacy network. The migration phase has these requirements:
- The legacy switches must be able to transfer BPDUs through the ACI
fabric.
- If the legacy switches fail to break a loop, Cisco ACI must break the loop.
Which group settings must be configured on VPC interface policy groups ipg_vpc-legacy_1 and ipg_vpc-legacy_2 to meet these requirements?
正解:C
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
Refer to the exhibit. A network engineer must improve the configuration backup process and the configuration restore process. The current ACI solution is integrated with VMMs and third-party L4-L7 devices. The process requires that no additional information be re-entered when importing the configuration for a fully-functional state. Which configuration configures the export policy?
正解:B
解答を投票する
An engineer needs to deploy a leaf access port policy group in ACI Fabric to support the following requirements:
- Control the amount of application data flowing into the system
- Allow the newly connected device to auto-negotiate link speed with
the leaf switch
Which two ACI policies must be configured to achieve these requirements? (Choose two.)
- Control the amount of application data flowing into the system
- Allow the newly connected device to auto-negotiate link speed with
the leaf switch
Which two ACI policies must be configured to achieve these requirements? (Choose two.)
正解:A、B
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
Refer to the exhibit. A Cisco ACI fabric uses L3Out to connect with R1. The 192.168.1.0/24 subnet is received over the physical interface Eth1/1 of Leaf1 and Leaf2. Which set of actions must be taken to receive the 2001:db8::2:1 subnet over the interface Eth1/1 interface?
正解:D
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
An engineer must integrate a Cisco ACI fabric with VMware and discover an ESXi host using LLDP. Two EPGs have been created and associated with the VMM domain. The engineer must configure the ACI such that contracts are pushed to the ACI leaf switches when the VM is mapped to EPG and the contracts are removed when LLDP is disabled. Which configuration must be selected to meet these requirements?
正解:A
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
Drag and Drop Question
An engineer is configuring a VRF for a tenant named Cisco. Drag and drop the child objects on the left onto the correct containers on the right for this configuration.
An engineer is configuring a VRF for a tenant named Cisco. Drag and drop the child objects on the left onto the correct containers on the right for this configuration.
正解:
Explanation:
https://www.cisco.com/c/en/us/td/docs/switches/datacenter/aci/apic/sw/1- x/Operating_ACI/guide/b_Cisco_Operating_ACI/b_Cisco_Operating_ACI_chapter_0111.html