3605 無料問題集「Avaya Ethernet Routing Switch Implementation and Maintenance」
A call centre is using the stacks of Ethernet Routing Switches (ERS) 5520-48T- PWR to supply power over Ethernet (PoE) to their IP telephones. Each switch is attached to 48 telephones. The call centre begins operation at 9:00 am each day and they
verify that the
switch can supply
enough power to support each telephone drawing their maximum power for all switches simultaneously. They are using the IP Phone port 10/100 switch. Which statement it is true if all telephones are drawing 13.2 watts simultaneously?
verify that the
switch can supply
enough power to support each telephone drawing their maximum power for all switches simultaneously. They are using the IP Phone port 10/100 switch. Which statement it is true if all telephones are drawing 13.2 watts simultaneously?
正解:D
解答を投票する
A campus network has been established with four Ethernet Routing Switch (ERS)
8600 switches in a switch cluster, two pairs with an Inter Switch Trunks (1ST)
running Split Multi-Link Trunk (SMLT) and Routed Split Multi-Link Trunking
(RSMLT). The traffic filters are required to block specific source IP addresses to
be forwarded through the core. How should these filters be set up?
8600 switches in a switch cluster, two pairs with an Inter Switch Trunks (1ST)
running Split Multi-Link Trunk (SMLT) and Routed Split Multi-Link Trunking
(RSMLT). The traffic filters are required to block specific source IP addresses to
be forwarded through the core. How should these filters be set up?
正解:B
解答を投票する