During a transformation project kick-off meeting, an architect highlights specific areas on which to focus while developing the new conceptual design.
Which two of the listed statements are business requirements? (Choose two.)

正解:D、E 解答を投票する
Which vSphere feature allows an administrator to reduce the storage consumption of virtual machines by reclaiming blocks of unused storage space on a VMFS datastore?

An application owner is concerned about their front-end web servers suffering an outage in the event of a host failure.
Which functional requirement could the architect include in the application design to mitigate this concern?

What do compliance requirements for a vSphere design entail?

An architect is designing a solution for an environment that has an application consisting of five resource-intensive virtual machines.
Which design recommendation should the architect make to avoid resource bottlenecks?

An architect is designing a new vSphere cluster. The requirement is to provide a total of 96 CPU cores and 1.5 TB RAM across all hosts.
The following information has been provided:
1. Two different physical hardware profiles are available for the ESXi hosts in the cluster.
- Profile 1: 16 CPU cores and 256 GB RAM
- Profile 2: 32 CPU cores and 512 GB RAM
2. Profile 2 is twice as expensive to purchase as Profile 1.
Which two aspects should the architect consider when selecting the hardware profile? (Choose two.)

正解:A、D 解答を投票する
An architect is tasked with recommending a solution for a company that is running out of VLANs.
Currently the company is running two separate data centers based on vSphere including an Enterprise Plus license.
In the first data center, the problem was solved by using VMware NSX and overlay network. In the second data center, there is currently no VMware NSX implementation in place and no budget for additional licenses.
What should the architect recommend as a potential solution to provide support for additional VLANs?

A new real-time financial service application is being developed by the engineering team at a financial firm and will be released as a public Software-as-a-Service (SaaS) offering. The solutions architect has designed and deployed a new vSphere environment and the supporting network infrastructure for hosting all public services. ESXi hosts are configured to use Precision Time Proalhazi@1tocol (PTP) and a local stratum-1 network time server.
Application provisioning and scaling will be managed by VMware vRealize Automation and can be run on Microsoft Windows or multiple distributions of Linux.
Which three recommendations should the architect include in the design to ensure that the service maintain timekeeping within an accuracy of one second? (Choose three.)

正解:B、C、E 解答を投票する
When configuring a vSphere High Availability (HA) cluster, which network redundancy option is recommended to ensure the availability of HA functionality even during a single network link failure?

An architect decides to separate virtual desktops and application servers into separate vSphere clusters to meet security and management requirements.
What are two implications of this design decision? (Choose two.)

正解:D、E 解答を投票する