A4040-109 無料問題集「IBM Assessment: Power Systems Virtualization Technical Support for AIX and Linux -v2」
A company has a VIO server supporting several infrastructure LPARs, including a NIM server, several NFS servers, and a document management server. Network connectivity is provided from the VIO server through the 1Gb IVE.
The NIM clients frequently receive "NFS Server not responding" errors during installations due to the volume of traffic to the server.
When planning an upgrade to POWER7 hardware, which action will minimize these errors?
The NIM clients frequently receive "NFS Server not responding" errors during installations due to the volume of traffic to the server.
When planning an upgrade to POWER7 hardware, which action will minimize these errors?
正解:A
解答を投票する
Based on the SuSE Linux /proc/ppc64/lparcfg contents on a Linux LPAR, how many
processing units are assigned to this system?
SuSE11_client:/ # cat /proc/ppc64/lparcfg lparcfg 1.8 serial_number=IBM,02067N14P system_type=IBM,8202-E4B partition_id=3 BoundThrds=1 CapInc=1 DisWheRotPer=5120000 MinEntCap=10 MinEntCapPerVP=10 MinMem=8192 MinProcs=1 partition_max_entitled_capacity=400 system_potential_processors=8 DesEntCap=200 DesMem=18432 DesProcs=4 DesVarCapWt=0 DedDonMode=0 partition_entitled_capacity=200 group=32771 system_active_processors=8
processing units are assigned to this system?
SuSE11_client:/ # cat /proc/ppc64/lparcfg lparcfg 1.8 serial_number=IBM,02067N14P system_type=IBM,8202-E4B partition_id=3 BoundThrds=1 CapInc=1 DisWheRotPer=5120000 MinEntCap=10 MinEntCapPerVP=10 MinMem=8192 MinProcs=1 partition_max_entitled_capacity=400 system_potential_processors=8 DesEntCap=200 DesMem=18432 DesProcs=4 DesVarCapWt=0 DedDonMode=0 partition_entitled_capacity=200 group=32771 system_active_processors=8
正解:C
解答を投票する
A customer is consolidating two POWER6 595 servers to a single Power 795. The two 595 servers each have 24 active processors and have the following LPARs using dedicated processors, running continuously:

The new Power 795 system will have two Processor Books (nodes), each with 8 cores activated in all MCMs (Multi Chip Modules).
LPAR1 is in need of more processing power. If all the other LPARs keep their existing Processor allocation, what is the maximum number of processors which can be allocated to LPAR1?

The new Power 795 system will have two Processor Books (nodes), each with 8 cores activated in all MCMs (Multi Chip Modules).
LPAR1 is in need of more processing power. If all the other LPARs keep their existing Processor allocation, what is the maximum number of processors which can be allocated to LPAR1?
正解:A
解答を投票する