A4040-332 無料問題集「IBM Assessment: High Availability for AIX - Technical Support and Administration -v2」
An administrator is planning a PowerHA implementation for a database and application. The application is dependent on the database being available before the application is started.
If the database is moved from one node to another, the application will need to be re-started. The database and application will be in different resource groups.
How can this be achieved within PowerHA?
If the database is moved from one node to another, the application will need to be re-started. The database and application will be in different resource groups.
How can this be achieved within PowerHA?
正解:A
解答を投票する
A cluster resource group has following application server characteristics:
An application server start script starts process A and process B.
An application monitor with the following settings: long-running, monitor interval=60, stabilization interval=180
The monitor method checks process B. and if process B is down it restarts process B and exits with return code 0.
When the cluster is started, an administrator finds process A is down and output of cluster.mmddyyyy log file is as follows; What happened?
An application server start script starts process A and process B.
An application monitor with the following settings: long-running, monitor interval=60, stabilization interval=180
The monitor method checks process B. and if process B is down it restarts process B and exits with return code 0.
When the cluster is started, an administrator finds process A is down and output of cluster.mmddyyyy log file is as follows; What happened?
正解:A
解答を投票する