AACE-PSP 無料問題集「AACE International Planning & Scheduling Professional (PSP)」

Why does activity 11001 not show successor activities?

Constraints control events or activities that __________________.

Why does activity 1001 have two successor activities?

What method offers the best chance of the schedule being used effectively to implement the project in the field?

There is only enough room for a maximum of 4 cranes to be placed on-site. Assuming that a single crane can perform 35 lifts per day and that a column pour requires 60 lifts, what is the minimum number of tower cranes that should be used for the above described column pours?

If the administrative constraints for developing the precedence diagram, as provided in the contract documents, indicate that no individual construction activities shall have a longer duration of two months, how many activities in the "normal" schedule would be affected?

In analyzing a logical chain of activities in a critical path method (CPM) schedule, what do differing total float values within that chain typically indicate?

Project delays are best analyzed

Which of the following project planning situations is the most frequent contributor to cost overruns?

Identify the minimum project duration.