AACE-PSP 無料問題集「AACE International Planning & Scheduling Professional (PSP)」

What changes to logic would eliminate Activity B from the critical path?

An earned value-based project control system can use either of which two budgets as the basis of its calculations?

Assuming conventional finish-to-start relationships, to calculate a schedule retaining the existing logic means that

What is the actual duration as of the status date or data date of Activity B?

Which of the following is NOT a tool or technique used to perform scope planning?

What is the relationship depicted between Activity G and Activity H?

Why does activity 1001 have two successor activities?

Determine the correct formula and date for the late start for Activity 9001.

In an earned value-based system, a schedule performance index of less than one for the project indicates the project is:

There is only enough room for a maximum of 4 cranes to be placed on-site. Assuming that a single crane can perform 35 lifts per day and that a column pour requires 60 lifts, what is the minimum number of tower cranes that should be used for the above described column pours?

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡