AD0-E906 無料問題集「Adobe Workfront for Experience Manager enhanced connector Expert」

A developer writes the following code to programmatically copy an existing asset to another folder in the DAM:

After executing this code. The developer receives the following exception:javax.jcr. PathNotFoundException What caused this issue?

解説: (JPNTest メンバーにのみ表示されます)
A customer sets up a calculated field on a request form. A user manually converts the request to a project and selects a template from the available active templates. How should the administrator configure the Project custom form to make sure the value is passed to the project on conversion?

解説: (JPNTest メンバーにのみ表示されます)
An implementation consultant is configuring the enhanced connector Project Linked holders feature for a customer. The customer wants the linked folder structure to be defined using the workfront Portfolio name. Workfront Program name. Workfront Project name, and the project type. The project type is a project custom form field defined by the following:

What Linked Folder Structure defines this correctly?

解説: (JPNTest メンバーにのみ表示されます)
On the dispatcher, the consultant is reviewing what HTTP request methods to allow to /bin/workfront-tools. The following methods are available: GET, HEAD, POST, PUT, and DELETE.
Which requests should be allowed?

A request form has a calculated field Allowable Days that calculates the number of days between the request Entry Date and the custom field Required Delivery Date.
What must be set up on the corresponding Prefect custom form so the Required Delivery Dale and the original number of Allowable Days display on the project?

解説: (JPNTest メンバーにのみ表示されます)
A web designer creates interactive web content via a URL. which needs to be approved I he user doing the reviewing has a Manager proofing permission profile in Adobe workfront. which they are currently accessing through the latest version of the Chrome browser. As part of the feedback process, the reviewer is required to leave comments on one page of the arte being reviewed before leaving the approval status. The Designer must be tagged in any updates required which tool should be used to accomplish this?

解説: (JPNTest メンバーにのみ表示されます)