API-510 無料問題集「API Pressure Vessel Inspector」

Pressure relieving device repair organizations shall have a fully documented quality control system and which of the following?

API-510 requires a hydrostatic test to be performed at what interval during the vessel's service life?

When the half bead or temper bead technique of repair is proposed, the first consideration that must be given should be;

The API authorized pressure vessel inspector may give prior authorization for repairs that do not involve:

During vessel repairs or alterations, who is required to maintain the welding records?

How does API-510 guide the decommissioning process for pressure vessels that are no longer fit for service?
正解:
API-510 guides the decommissioning process for pressure vessels by outlining a series of steps designed to ensure safety and compliance with environmental regulations. The process begins with a thorough cleaning to remove any hazardous substances, followed by a comprehensive inspection to document the vessel's condition. The vessel is then isolated and, if necessary, cut into manageable sections for removal, using methods that prevent any contamination or environmental impact. Finally, all associated documentation is updated to reflect the decommissioning, and materials are recycled or disposed of in accordance with local environmental standards.
According to API-510, which type of record must be permanently maintained for a pressure vessel?

The best description of Temper embrittlement is:

The remaining life of a vessel is 24 years.
What is the maximum interval for the internal inspection?

What is the standard interval for external inspections under API-510 for vessels in severe service conditions?

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡