ASDEV01 無料問題集「Blue Prism Certified Associate Developer」

Drag and drop the Blue Prism stage names on the left into the placement boxes (A - E) so that the dropped stage names correspond with the image of the Blue Prism stage beside it:
正解:

Explanation
A. Note Stage B. Process Stage C. Action Stage D. Block Stage E. Multi Calc The note stage has an icon of a yellow sticky note, the process stage has an icon of a blue circle with a white arrow, the action stage has an icon of a blue circle with a white lightning bolt, the block stage has an icon of a blue rectangle with a white X, and the multi calc stage has an icon of a blue circle with a white calculator1.
References: 1 https://bpdocs.blueprism.com/bp-6-8/en-us/stage-types.htm
When a Work Queue item is currently being processed by a Digital Worker what happens to the queue item?

解説: (JPNTest メンバーにのみ表示されます)
Which of the following are true about a Blue Prism Breakpoint?
(Select all items that apply)

正解:C、D 解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
Drag and drop the Blue Prism debug tool names on the left, onto the placement boxes (A- E) so that the dropped tool name corresponds with the debug tool description beside it:
正解:

Explanation

These are the correct matches between the debug tool names and their descriptions. They allow the user to control and observe the execution of a process or object in studio. The other options are either incorrect or not available. References:
https://bpdocs.blueprism.com/bp-6-10/en-us/helpDebug.htm?TocPath=Interface%7CStudio%7CProcess%20stud (page 1)
Which of the following statements are correct when considering an element's attributes in Application Modeller?
(Select all items which apply)

正解:A、D 解答を投票する
解説: (JPNTest メンバーにのみ表示されます)

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡