次の認定試験に速く合格する!
簡単に認定試験を準備し、学び、そして合格するためにすべてが必要だ。
(A)Negative public relations
(B)Reduced customer satisfaction
(C)Legal fees
(D)Damaged brand perception
(A)Classified and Declassified
(B)Up and Down
(C)Mean and Median
(D)Direct and Indirect
(A)Inergen
(B)Pro-inert
(C)Water sprinkler
(D)Total Flooding
(A)The Fire Triangle
(B)The Fire Class
(C)The Fire Hexagon
(D)The Fire Technology
(A)Rolling Load (RL)
(B)All loads are equally damaging to raised floor tiles
(C)Uniformly Distributed Load (UDL)
(D)Concentrated Load / Point Load (CP/ PL)
(A)The first number represents the diameter of the core; the second number represents the diameter of the cladding in microns.
(B)The first number represents the distance for a 10 Gb/s connection; the second number represents the distance for a 1 Gb/s connection.
(C)The first number represents the required distance to single-phase power cabling; the second number represents the required distance to three-phase cabling.
(D)The first number represents the diameter of the core; the second number represents the actual diameter cable including the buffer and jacket.
(A)Only at emergency escape doors
(B)At every door including riser doors, doors of storage closets etc.
(C)Only at the main entrance of the data centre building
(D)At every door providing a pathway
我々は12時間以内ですべてのお問い合わせを答えます。
オンラインサポート時間:( UTC+9 ) 9:00-24:00月曜日から土曜日まで
サポート:現在連絡