CQE 無料問題集「ASQ Certified Quality EngineerExam」

A process that is in statistical control has the following characteristics.
X 122
J? = 2! n = 5
What are the upper and lower control limits for the A'chart of this process?

解説: (JPNTest メンバーにのみ表示されます)
A company decides to adopt a total quality system and has started the process by developing quality policies.
Rank in order, from first to last, the rest of the steps that need to be performed to implement this system.
1.Audit the system
2.Determine system requirements
3.Develop a measurement system
4.Perform continuous improvement activities
H Calculator

解説: (JPNTest メンバーにのみ表示されます)
A way to convince management that a quality improvement program is needed is to present

解説: (JPNTest メンバーにのみ表示されます)
Which of the following tools can be used to classify or determine a safety quality characteristic?

解説: (JPNTest メンバーにのみ表示されます)
The table below shows the results of inspecting 3,752 items. On the basis of this information, a Pareto chart would show what cumulative percent of nonconformities by the end of the third operation?
Order of OperationNumber of Nonconforming ItemsPercent of Nonconforming ItemsPercent of Nonconformities
1-3729.9%55.0%
2nd1564.2%23.3%
3 rd782.1%11.7%
4*501.3%7.2%
5th200.5%2.8%
Calculator

解説: (JPNTest メンバーにのみ表示されます)
Which of the following activities is a form of error-proofing?

解説: (JPNTest メンバーにのみ表示されます)
The number of runs required by a full-factorial design with three factors each at two levels is equal to

解説: (JPNTest メンバーにのみ表示されます)
When subgroups are selected in a way that minimizes the opportunity for variation within a subgroup and maximizes the opportunity to detect variation between subgroups, this subgrouping is known as

解説: (JPNTest メンバーにのみ表示されます)
A process produces rejects at a rate of 6° o. If multiple samples of 5 are drawn from a population of 100.000.
what is the expected number of rejects per sample?

解説: (JPNTest メンバーにのみ表示されます)
A production line has job aids that outline, step by step, how to perform the tasks of the job. This is followed by each of the operators working on the line. This is an example of

解説: (JPNTest メンバーにのみ表示されます)

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡