The essence of Lean is to concentrate effort on removing waste while improving process flow to achieve speed and agility at lower cost.

The very best way to begin an effort to map a process is to do which of these?

It is a Type I error if we reject the Null Hypothesis when it is actually true.

A Belt concludes a Lean Six Sigma project with the creation of a Control Plan. At what point can the Control Plan be closed?

Having an Alpha of .05 and a Beta of .10 are the most common risk levels when running a Statistical test.

Nominal Scale data consists of names, labels or categories and cannot be arranged in any mathematical ordering scheme. Complex arithmetic functions cannot be easily applied to Nominal Data:

Contingency Tables are used to do which of these? (Note: There are 2 correct answers).

正解:A、B 解答を投票する
What is the Cycle Time, in seconds, for a process having a Throughput of 7,200 units per hour?

The Central Limit Theorem helps us understand the ___________ we are taking and is the basis for using sampling to estimate population parameters.

When a Belt applies the practice of Poka-Yoke to a project challenge she is attempting to make certain the activity is _______________ .