(A)An optional task that the client can determine is needed once the project is underway
(B)A task that will be required if specific conditions occur at the project site
(C)A task that cannot begin before another task has been completed
(D)A task that must be completed by a specific date
(A)Both in-scope and out-of-scope items
(B)Only the items within the project scope
(C)Only the items within the deliverable scope
(D)All the tasks that have to be performed
(A)Inside the room
(B)Close to the transmitter
(C)Outside the rack
(D)Inside the rack
(A)Impedance bridge/meter
(B)Volt meter
(C)Pink noise generator
(D)Ohm meter
(A)roll the gear in and out easily
(B)protect the integrity of the system
(C)ensure only technical personnel can access it
(D)hide it discretely in a closet
(A)The deadline for completion
(B)The client's need
(C)The overall budget
(D)The cost of materials
(A)refresh rate
(B)aspect ratio
(C)signal-to-noise ratio
(D)frame rate
(A)Resting the cables gently on the ceiling tile
(B)Stacking the cables along one side of the ceiling grid
(C)Interlacing the cables
(D)Securing the cables with bridle rings mounted to bar joists
(A)Try to find the specific model through an online vendor
(B)Discuss the need for change with the AV designer and your project manager
(C)Install another similar model and record the model number on the project documentation
(D)Redline the change on the appropriate project document, send it to your project manager for submission of a formal RFI or RFC, and wait for a CO
(A)Fiber-optic cable
(B)Coaxial cable
(C)Shielded twisted-pair cable
(D)Unshielded twisted-pair cable