An architect is configuring BCSD to design SRDF/S between two new PowerMax arrays. The architect has completed the tasks for the local side of the solution, including RA Port Group, Replication Group, and site switch.
What is the correct order of steps the architect needs to take to complete the SRDF setup?
What is the correct order of steps the architect needs to take to complete the SRDF setup?
正解:
A PowerMax Storage Group has Host I/O limits set at 10000 IOPS. The Port Group contains four ports across different directors. The Dynamic Distribution is set to OnFailure.
What is the maximum IOPS the Storage Group can achieve in the event a switch port being used by one of the director ports fails but the director remains online?
What is the maximum IOPS the Storage Group can achieve in the event a switch port being used by one of the director ports fails but the director remains online?
正解:D