次の認定試験に速く合格する!
簡単に認定試験を準備し、学び、そして合格するためにすべてが必要だ。
(A)3
(B)1
(C)2
(D)40
(A)N/N+1
(B)N
(C)N+1
(A)Support C13 and C19 and national standard sockets
(B)Smart rPDU supports remote monitoring, but does not support remote shutdown.
(C)There are half height and full height
(A)Prefabricated installation
(B)Decentralized installation.
(C)Wall cabinet installation
(A)T3 condition - 10°C ~45°C
(B)Wide temperature condition -40°C~55°C
(C)T1 working condition -20°C-45°C
(D)Normal temperature condition 0°C-45C
(A)Compatible with upper and lower incoming lines
(B)Downstream
(C)Top entry line
(A)4
(B)2
(C)8
(D)6
(A)Battery temperature sensor
(B)Port battery inspection instrument
(C)Dry contact expansion board
(D)Upper air outlet assembly
(A)False
(B)True
(A)FusionModule1000B
(B)FusionModule800
(C)FusionModule1000A
(D)FusionModule500
(E)FusionModule2000
(A)Huawei
(B)INVT
(C)Emerson
(D)Schneider
(A)Integrated cabinet: CE/CCC/ROHS
(B)Air conditioner: CCC/CE/REACH/ROHS
(C)Integrated cabinet: CE/REACH/ROHS
(D)Air conditioner: REACH/ROHS
(A)Dual power supply Both
(B)Other
(C)AB are right
(D)Single power supply
我々は12時間以内ですべてのお問い合わせを答えます。
オンラインサポート時間:( UTC+9 ) 9:00-24:00月曜日から土曜日まで
サポート:現在連絡