The Data Center Design Specification GB50174-2017 stipulates that when selecting a site, a data center using cooling should have sufficient water supply.

When only supporting temperature detection and not supporting hot-swap configuration, the switches in the plug-in frame must be fully equipped.

What is the maximum IT power supported by the Fusionmodule2000 precision power distribution cabinet?

FusionDC1000 battery cabinet can hold up to () batteries
正解:
16
How far can the FusionModule1000AV2R3 version IT cabinet slide in both directions?

Air conditioning water system includes cooling water system, chilled water system and condensing water system

The asset management module of the NetEco management system can manage the equipment in the computer room: Which of the following equipment is not within the management scope of the NetEco asset management module?

The four remote controls mentioned in the monitoring system refer to telemetry, telesignaling, teleadjustment, and telecontrol. The corresponding monitoring signals are AI, DI, AO, and DO.

High rate batteries have advantages in short-term discharge conditions, and can discharge up to
90%

What are the temperature control products used in the FusionModule1000AV2R3 version I solution?

Huawei's self-developed air conditioner has a 6kV lightning protection filter function, the highest in the industry

What are the specifications of FusionModule500UPS? (Multiple choice)

正解:A、B、D 解答を投票する