HFDP 無料問題集「ASHRAE Healthcare Facility Design Professionals」

A central cooling system is designed so that the number and arrangement of cooling sources is sufficient to support the facility operation plan in case of a breakdown of any one of the cooling sources. According to ASHRAE Standard 170, this applies when the cooling load exceeds a MINIMUM of:

Replacement of existing roof membranes, replacement of existing doors, and replacement of less than 25% of existing windows are exempt from complying with ANSI/ASHRAE/IESNA Standard 90.1-2004 in which of the following situations?

Which of the following particles has the smallest aerodynamic diameter?

A requirement for smoke compartmentation in hospitals is to provide:

Which of the following is considered to be an objective of a rigorous commissioning process?

How can negative air pressure BEST be maintained between the construction area and the occupied area of a hospital?

Which of the following represents the MINIMUM allowable area of non-aspirating diffuser required for a 400 sq. ft. (37.16 sq. m) Class C Operating Room with 1,267 CFM (598 L/s) air supply?

解説: (JPNTest メンバーにのみ表示されます)
When designing a hospital, which of the following is the energy standard that should be reviewed?

Which of the following standards requires a machinery room when the maximum amount of refrigerant per the standard is exceeded?

A decontamination area that requires 6 ACH and has a volume of 10 ft. x 10 ft. x 8 ft. (3.05 m x 3.05 m x 2.44 m) requires a MINIMUM of how many exhaust cfm (L/s)?

解説: (JPNTest メンバーにのみ表示されます)

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡