HPE0-S58 無料問題集「HP Implementing HPE Composable Infrastructure Solutions」

A customer wants to expand their existing cluster using the Grow Cluster functionality from OneView for vCenter Server by Image Streamer is not available.
Which OS build plan managed by HPE OneView for vCenter Server can the customer use?

解説: (JPNTest メンバーにのみ表示されます)
A customer is planning to deploy OneView for vCenter Server to improve management procedures for growing virtualization environment. The customer is concerned about resources required by HPE OneView for vCenter Server.
Which statement about deploying HPE OneView for vCenter Server is true?

解説: (JPNTest メンバーにのみ表示されます)
An integrator is creating a server profile template for a VMware Cluster in a Synergy environment. The network administrator has given the server team two 40Gb uplinks with all 200 VLANs presented.
Click the appropriate network type that the integrator should select.
正解:

Reference:
https://support.hpe.com/hpsc/doc/public/display?docId=emr_na-a00050865en_us&docLocale=en_US (13)
An integrator is performing initial configuration of three-frame Synergy solution with HPE Image Streamer.
Which networks must be created for this configuration? (Choose two.)

正解:A、D 解答を投票する
An HPE Synergy compute module has a template-based server profile with two identically configured connections, each containing five VLANs.
What is the most efficient method the integrator can use to add a new VLAN to each connection?

A customer tries to revert a data volume located on the HPE 3PAR array to a specific snapshot that was taken using HPE Composer, but the process fails.
What must an integrator do to fix this problem?

Using SSMC, an integrator has added a new CPG on the HPE 3PAR StoreServ array integrated with HPE Composer.
The new CPG is not visible in the HPE Composer.
What must the integrator do to see the new CPG in the HPE Composer console?

A customer needs to expand a single-frame Synergy solution to two frames.
What should the integrator do to establish a proper management network for the two frames?

A customer needs to deploy HPE Global Dashboard appliance, but experienced vCenter Server failure and cannot access ESXi servers.
How can the customer connect to the specific ESXi server to power on important virtual machines?

Which approach should an integrator take to efficiently configure a 10-frame Synergy environment that has been fully populated with compute nodes?

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡