次の認定試験に速く合格する!
簡単に認定試験を準備し、学び、そして合格するためにすべてが必要だ。
(A)host routes enabled
(B)access-routes enabled
(C)ip access-routes
(D)ip host routes
(A)subinterface fastethernet 3/1.200.1 profile ip-info
(B)pppoe subinterface fastethernet 3/1.200.1 profile ip-info
(C)pppoeinterface fastethernet 3/1.200.1 profile ip-info
(D)pppoe interface fastethernet 3/1.200.1 profile ip-info
(A)Each PVC has a separate /30 subnet.
(B)It burns up IP addresses.
(C)It conserves IP addresses.
(D)It results in a smaller routing table.
(A)aaa domain-map
(B)l2tp destination profile
(C)remote host
(D)profile
(A)classifier ACL
(B)policy list
(C)profile
(D)LCP negotiation
(A)It terminates the PPP session and initiates the tunnel.
(B)It terminates the PPP session and terminates the tunnel.
(C)It initiates both the PPP session and the tunnel.
(D)It initiates the PPP session and terminates the tunnel.
(A)static route
(B)loopback reference
(C)hostname
(D)virtual router
(A)It dynamically creates a host route in the routing table.
(B)It statically associates an IP address with a customer.
(C)It statically places a host route in the routing table.
(D)It dynamically assigns an address to the router's interface.
(A)PPP over Ethernet
(B)Routed 1483
(C)Bridged 1483
(D)PPP over ATM
(A)Group 1 - Slots 2 & 3 Group 2 - Slot 4 Group 3 - Slot 5 Group 4 - Slot 6
(B)Group 1 - Slot 2 Group 2 - Slot 3 Group 3 - Slot 4 Group 4 - Slot 5 & 6
(C)Group 1 - Slot 3 Group 2 - Slot 4 Group 3 - Slot 5 Group 4 - Slots 6 & 7
(D)Group 1 - Slots 0 &1 Group 2 - Slot 2 Group 3 - Slot 3 Group 4 - Slot 4
我々は12時間以内ですべてのお問い合わせを答えます。
オンラインサポート時間:( UTC+9 ) 9:00-24:00月曜日から土曜日まで
サポート:現在連絡