A project has performed an energy model which has resulted in the following energy end use consumption:
To meet the requirements for Energy and Atmosphere Credit, Advanced Energy Metering, Option 2.
Advanced Metering, energy meters must be installed for energy end uses in
To meet the requirements for Energy and Atmosphere Credit, Advanced Energy Metering, Option 2.
Advanced Metering, energy meters must be installed for energy end uses in
正解:C
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
A design team is working on the hotel interior project in a hot and dry location. A heating, ventilating and air conditioning (HVAC) system is within the project scope. Which of the following strategies will contribute to minimization of ozone depleting potential and global warming potential for the project?
正解:D
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
A tenant with 1,000 employees wishes to pursue LEED Interior Design and Construction Certification for their space in which they will be the sole tenant. Which of the following building attributes will help the tenant achieve points in the Location and Transportation category?
正解:B
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
A project needs 5,000 ft2 (464.5 m2) of raised flooring. The tenant wants to refurbish and install an existing raised floor from another building as part of the project. If this material will equate to 14% of the overall project materials cost, which credit would this contribute towards?
正解:A