A project incorporates steel beams as an interior architectural feature, but no recycled content information is available. When calculating the recycled content of the beams, which default content amount should be used?

解説: (JPNTest メンバーにのみ表示されます)
Which of the following should a project team take into consideration during the discovery phase of site selection to earn Integrative Process Credit?

解説: (JPNTest メンバーにのみ表示されます)
Which material would have the largest contribution to Materials and Resources Credit, Building Product Disclosure and Optimization- Sourcing of Raw Materials, Option 2. Leadership Extraction Practices?

解説: (JPNTest メンバーにのみ表示されます)
A project has performed an energy model which has resulted in the following energy end use consumption:

To meet the requirements for Energy and Atmosphere Credit, Advanced Energy Metering, Option 2.
Advanced Metering, energy meters must be installed for energy end uses in

解説: (JPNTest メンバーにのみ表示されます)
If the client has purchased green power that is not Green-e certified, then the project team should

解説: (JPNTest メンバーにのみ表示されます)
A design team is working on the hotel interior project in a hot and dry location. A heating, ventilating and air conditioning (HVAC) system is within the project scope. Which of the following strategies will contribute to minimization of ozone depleting potential and global warming potential for the project?

解説: (JPNTest メンバーにのみ表示されます)
A tenant with 1,000 employees wishes to pursue LEED Interior Design and Construction Certification for their space in which they will be the sole tenant. Which of the following building attributes will help the tenant achieve points in the Location and Transportation category?

解説: (JPNTest メンバーにのみ表示されます)
Which of the following can be considered pre-consumer recycled content?

解説: (JPNTest メンバーにのみ表示されます)
A project needs 5,000 ft2 (464.5 m2) of raised flooring. The tenant wants to refurbish and install an existing raised floor from another building as part of the project. If this material will equate to 14% of the overall project materials cost, which credit would this contribute towards?

解説: (JPNTest メンバーにのみ表示されます)
Which of the following is required for a cooling tower and evaporative condenser in the Water Efficiency Prerequisite, Indoor Water Use Reduction?