LEED-AP-ID-C 無料問題集「USGBC LEED AP Interior Design + Construction (LEED AP ID+C) V4」
A tenant moving into an existing building will need to install new HVAC, power, lighting systems and other equipment.
Which of the following resources would help the tenant meet the requirements of Energy and Atmosphere Credit, Optimize Energy Performance?
Which of the following resources would help the tenant meet the requirements of Energy and Atmosphere Credit, Optimize Energy Performance?
正解:C
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
A project owner is seeking Location & Transportation Credit, Surrounding Density and Diverse Uses for an office that is being relocated. In order to promote walkability and reduce the distance driven by employees, which of the following solutions should the project owner consider?
正解:B
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
A project team member has prepared a map and an accompanying table as documentation for Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 2. Diverse Uses. The map includes the location of each use, the location of the project, and the main entrance of the building. The table includes the distance to each use, the name of each use, and the category of each use. The team lead reviews the documentation and notes an important missing item. Which of the following s the most important item to add to the documentation?
正解:C
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
Design is underway for a new tenant suite with 4,000 ft2 (371.6 m2) of net occupiable area. The project build-out will include all new HVAC systems. Operable windows are installed as follows:
A total 75 ft2 (7.0 m2) located within 15 ft. (4.6 m) of all spaces
. A total 50 ft2 (4.6 m2) located within 25 ft. (7.6 m) of all spaces
Which design and documentation strategies must be used to demonstrate compliance with Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?
A total 75 ft2 (7.0 m2) located within 15 ft. (4.6 m) of all spaces
. A total 50 ft2 (4.6 m2) located within 25 ft. (7.6 m) of all spaces
Which design and documentation strategies must be used to demonstrate compliance with Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?
正解:C
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
A photovoltaic (PV) system was installed after commissioning (Cx) was completed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification?
正解:D
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)