LEED-AP-ND 無料問題集「USGBC LEED AP Neighborhood Development (LEED ND)」
A developer is considering purchasing a 400-acc (161 hectare) site which la currently zoned (or two dwelling units(DU) per sere (five DU/hectare).Which initial action during the entitlement process would help make the site eligible for LEED for NeighborhoodDevelopment certification?
正解:D
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
To achieve Neighborhood Pattern and Design Credit. Community Outreach and involvement. Option 1:
Community Outreach during Preliminary Design, the project team must advertise and host at leastone community meeting. Which of thefollowing is an example ofa community meeting that is applicable towards this credit?
Community Outreach during Preliminary Design, the project team must advertise and host at leastone community meeting. Which of thefollowing is an example ofa community meeting that is applicable towards this credit?
正解:C
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
For a 100% previously developed site, which of the following steps should the project team take during the Initial stages of planning to meet the requirements of Smart Location and Linkage Prerequisite. Imperiled Species and Ecological Communities Conservation?
正解:A
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
A LEED forNeighborhood Development project is going to temporarily reroute existing transit service outside the required distances as pan or the construction process.The protect team has secured an agreement withthe transit agency to restore the rerouted service. What is the maximum number of years the service can be rerouted in order to quality tor Smart Location and Linkage Credit. Access to Quality Transit?
正解:C
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)