LEED-AP-ND 無料問題集「USGBC LEED AP Neighborhood Development (LEED ND)」

Which of thefollowing would meet the requirements of an infill site?

解説: (JPNTest メンバーにのみ表示されます)
A project calculates an overall annual heating and/or cooling consumption reduction using an energy efficiency model. Whichcredit would this calculation aid in documenting?

解説: (JPNTest メンバーにのみ表示されます)
Which of the following can be included within the boundary of a project site on an urban waterfront?

解説: (JPNTest メンバーにのみ表示されます)
A project site would automatically comply with Smart Location and Linkage Prerequisite. Wetland and Water Body Conservation if the project site is

解説: (JPNTest メンバーにのみ表示されます)
Which of thefollowing site conditions should be considered in the selection of renewable energy technologies for Green Infrastructure and Buildings Credit. Renewable Energy Production?

解説: (JPNTest メンバーにのみ表示されます)
A project team is planning to achieve the maximum points in the Regional Priority category. The LEED AP should

解説: (JPNTest メンバーにのみ表示されます)
A developer has 100 acres (40 declares) of undeveloped forest The vision of the community is to preserve over 60% of the land as undeveloped Which of the following can help the project to quality for the Smart Location and Linkage Prerequisite. Smart Location?

解説: (JPNTest メンバーにのみ表示されます)
Which of the following will be achieved If the project site is an infill site?

解説: (JPNTest メンバーにのみ表示されます)
For credits requiring bicycle storage as well as shower and changing facilities, shower requirements may be met in office buildings by providing

解説: (JPNTest メンバーにのみ表示されます)
Which location typewould earn the maximum points under the Smart Location and Linkage Credit. Preferred Locations Option 1: Location Type?

解説: (JPNTest メンバーにのみ表示されます)

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡