LEED-AP-ND 無料問題集「USGBC LEED AP Neighborhood Development (LEED ND)」

A local zoning code limits density on a residentially-zoned 10-acre (four hectare) parcel to 65 total units The site la outside ofwalking distance to transit service.Howcould this project be eligible for Neighborhood Pattern and Design Prerequisite Compact Development?

解説: (JPNTest メンバーにのみ表示されます)
Which of the following strategies is a best practice for reducing a project's development footprint?

解説: (JPNTest メンバーにのみ表示されます)
To develop within a 100-year flood plain and still meet the requirements of Smart Location and Linkage Prerequisite. Floodplain Avoidance, the project team must comply with the National Flood Insurance Program (NFIP) and locate the project

解説: (JPNTest メンバーにのみ表示されます)
Atleast how many buildings within a LEED for Neighborhood Development project must be certified by a green building rating system?

解説: (JPNTest メンバーにのみ表示されます)
On a project with 10 residential units, which of the following would contribute to achieving Neighborhood Pattern and Design Credit. Neighborhood Schools?

解説: (JPNTest メンバーにのみ表示されます)
An undeveloped five acres (two hectare) site has a two-acre (0.8 hectare) area sloping al 50%. To achieve SmartLocation and Linkage Credit. Steep Slope Protection, what possible percentage ofthe site could be developed?

解説: (JPNTest メンバーにのみ表示されます)
A mixed-use development's total building area is 1.742.400 ft1 (161 874 m2) with 350 planned dwelling units Within a 1/2 mi. (08 km) walking distance are 20 diverse uses totaling 550.000 ft2 (51 096 m2) and 375 full- time jobs.
To achieve Smart Location and Linkage Credit. Housing and Jobs Proximity, what is the minimum areaof the residential component ofthe project?

Which of the following can be included within the boundary of a project site on an urban waterfront?

解説: (JPNTest メンバーにのみ表示されます)
What reference standard is used to determine compliance with Green Infrastructure and Buildings Prerequisite. Minimum Building Energy Performance when the whole building energy modeling option is used?

解説: (JPNTest メンバーにのみ表示されます)
Which of the following la an eligible source of renewable energy tot Green Infrastructure and Buildings Credit. Renewable Energy Production?

解説: (JPNTest メンバーにのみ表示されます)

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡