Which strategies allow the project to achieve maximum points under Location and Transportation Credit, Alternative Transportation?

解説: (JPNTest メンバーにのみ表示されます)
In the calculations for Water Efficiency Prerequisite, Indoor Water Use Reduction, private use refers to lavatory faucets used by which of the following types of occupants?

解説: (JPNTest メンバーにのみ表示されます)
A new office building was LEED Gold certified, and the tenants have occupied the space for one month. The property manager would like to certify the building under LEED for Building Operations and Maintenance:
Existing Buildings.
What program requirements apply?

解説: (JPNTest メンバーにのみ表示されます)
A LEED AP would like to maximize the response rate of the transportation survey in the building. What methods would be acceptable?

解説: (JPNTest メンバーにのみ表示されます)
In order to earn Indoor Environmental Quality Credit, Green Cleaning - Custodial Effectiveness Assessment, what is the highest APPA Leadership in Educational Facilities' Custodial Staffing Guidelines score a facility may achieve?

解説: (JPNTest メンバーにのみ表示されます)
What must the project team do regardless of building type for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

解説: (JPNTest メンバーにのみ表示されます)
In order for a project team to meet the requirements of Indoor Environmental Quality Credit, Integrated Pest Management, how much advanced notice to building occupants is needed after the emergency application of a pesticide other than the least toxic pesticide?

解説: (JPNTest メンバーにのみ表示されます)
Using the following table, the number of cooling tower cycles in Water Efficiency Credit, Cooling Tower Water Use is determined by which five parameters in the rating system?(Click on Exhibit)

解説: (JPNTest メンバーにのみ表示されます)
What credit or prerequisite requires a plan for a hazardous spill cleanup?

解説: (JPNTest メンバーにのみ表示されます)
A project is pursuing Materials and Resources Credit, Solid Waste Management - Facility Maintenance and Renovation. The project has generated the following waste as part of their Facility Maintenance and Renovation activities: 2,000 lbs. (907.2 kg) of steel, 900 lbs. (408.2 kg) of carpet, 1,100 lbs. (498.9 kg) of wood, and 1,500 lbs.
(680.4 kg) of wallboard. If the project has diverted 1,800 lbs. (816.4 kg) of steel, 900 lbs. (408.2 kg) of carpet,
1,000 lbs. (453.6 kg) of wood, and 250 lbs. (113.3 kg) of wallboard, what is the actual diversion rate achieved?

解説: (JPNTest メンバーにのみ表示されます)