LEED-AP-O-M 無料問題集「USGBC LEED AP Operations +Maintenance (LEED AP O+M)」
A building manager benchmarks a building's energy performance in ENERGY STAR Portfolio Manager for the purposes of Energy and Atmosphere Prerequisite, Minimum Energy Performance. The use of the energy use intensity (EUI) tool in Portfolio Manager also satisfies which of the following steps performed under Energy and Atmosphere Prerequisite, Energy Efficiency Best Management Practices?
正解:D
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
A new office building was LEED Gold certified, and the tenants have occupied the space for one month. The property manager would like to certify the building under LEED for Building Operations and Maintenance:
Existing Buildings.
What program requirements apply?
Existing Buildings.
What program requirements apply?
正解:B
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
A building manager changes the sequence of operation for boilers to better match heating demand as a result of an ASHRAE Level 2 analysis. Which of the following is an example of an appropriate topic for training of building operations staff to continue implementation of this change and meet the requirements of Energy and Atmosphere Credit, Existing Building Commissioning - Implementation?
正解:C
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
An urban office building project is installing a cooling tower. To save on potable water, the project would like to use a non-potable water source to provide 20% of the cooling tower makeup water to achieve the maximum number of points under Water Efficiency Credit, Cooling Tower Water Use. Which non-potable water source would be the most appropriate for use?
正解:A
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)