A company that produces rubber hose using Discreet orders accounts for raw material scrap after report as finished though inventory movement journals.
The company has noticed that most of the scrap that is recorded is due to start up that feeds the hose to the finishing process. In addition, the amount of scrap that is recorded is consistent regardless of the amount of hose being produced.
You need to account for material lost during startup.
What should you do?
The company has noticed that most of the scrap that is recorded is due to start up that feeds the hose to the finishing process. In addition, the amount of scrap that is recorded is consistent regardless of the amount of hose being produced.
You need to account for material lost during startup.
What should you do?
正解:C
解答を投票する
You are the lead product design manager at a Process manufacturing plant.
You are building a formula that produces egg yolks as a by-product. This by-product is added back into inventory at standard cost and can be used in other production batches.
You need to select the by-product cost allocation.
Which cost allocation type should you use?
You are building a formula that produces egg yolks as a by-product. This by-product is added back into inventory at standard cost and can be used in other production batches.
You need to select the by-product cost allocation.
Which cost allocation type should you use?
正解:D
解答を投票する
A company uses Dynamics 365 Supply Cham Management.
Several production orders are in the started status.
An issue with equipment causes a rollback in the production status tor some of the orders.
Some orders must be reset once the equipment is repaired, based on which products were being manufactured.
You need to reset the production orders based on the requirements
Which status should you use for each requirement? To answer, drag the appropriate statuses to the correct requirements. Each status may be used once, more than once, or not at all.
You may need to drag the split bar between panes or scroll to view content.
Several production orders are in the started status.
An issue with equipment causes a rollback in the production status tor some of the orders.
Some orders must be reset once the equipment is repaired, based on which products were being manufactured.
You need to reset the production orders based on the requirements
Which status should you use for each requirement? To answer, drag the appropriate statuses to the correct requirements. Each status may be used once, more than once, or not at all.
You may need to drag the split bar between panes or scroll to view content.
正解:
Note: This question is part of series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses batch tracking of raw materials, semi-finished goods, and finished goods.
It is difficult to determine when semi-finished and finished goods were produced and expired.
You need to incorporate automatic batch expiration dates for tracked items that are produced.
Solution:
1. Assign shelf life period in days to the items that require expiration dates.
2. Create a new batch number in the tracking dimensions for the items.
3. Enter the manufacturing date.
4. Save the record.
Does the solution meet the goal?
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses batch tracking of raw materials, semi-finished goods, and finished goods.
It is difficult to determine when semi-finished and finished goods were produced and expired.
You need to incorporate automatic batch expiration dates for tracked items that are produced.
Solution:
1. Assign shelf life period in days to the items that require expiration dates.
2. Create a new batch number in the tracking dimensions for the items.
3. Enter the manufacturing date.
4. Save the record.
Does the solution meet the goal?
正解:A
解答を投票する
A company uses Dynamics 365 for Finance and Operations for Process manufacturing.
Employees spend considerable time cleaning and setting up machines in a specific area between production orders. You must group production activities to optimize cleaning and set up time.
You need to set up the system.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
NOTE: More than one order of answer choices is correct. You will receive credit for any of the correct orders you select.
Employees spend considerable time cleaning and setting up machines in a specific area between production orders. You must group production activities to optimize cleaning and set up time.
You need to set up the system.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
NOTE: More than one order of answer choices is correct. You will receive credit for any of the correct orders you select.
正解:
1 - Create sequence IDs specifying values and ranking
2 - Create sequence groups
3 - Assign sequence IDs to items
4 - Assign sequence group IDs to resources and resource groups
Reference:
https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/set-up-product-sequences
A company implements manufacturing in Dynamics 365 Supply Chain Management.
The company wants to efficiently produce products comprised of different order types.
You need to select the appropriate production plan.
Which production process should you use for the production run?
The company wants to efficiently produce products comprised of different order types.
You need to select the appropriate production plan.
Which production process should you use for the production run?
正解:D
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
A company implements Dynamics 365 for Finance and Operations.
Production orders are generated for products directly from projects. You create the following production order:
Use the drop-down menus to select the answer choice that answers each question based on the information presented in the graphic. NOTE: Each correct selection is worth one point.
Production orders are generated for products directly from projects. You create the following production order:
Use the drop-down menus to select the answer choice that answers each question based on the information presented in the graphic. NOTE: Each correct selection is worth one point.
正解:
A candy manufacturer uses Dynamics 365 Supply Chain Management.
A master planning run needs to prioritize the production jobs for fruit snacks by flavor and color every 16 days.
You need to configure the appropriate parameters in the coverage group.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
A master planning run needs to prioritize the production jobs for fruit snacks by flavor and color every 16 days.
You need to configure the appropriate parameters in the coverage group.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
正解:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/master-planning/master-planning-setup
You are building the Bill of materials (BOM) for a new production item. The new item has a subcomponent.
Subproduction orders for the subcomponent must be created when estimating production orders.
You need to configure the BOM line to generate subproduction orders.
Which BOM line type should you use?
Subproduction orders for the subcomponent must be created when estimating production orders.
You need to configure the BOM line to generate subproduction orders.
Which BOM line type should you use?
正解:D
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
A company uses Dynamics 365 Process manufacturing.
Employees work a half day so that they can attend a company event. You have a rush order that must be completed that same day.
After reviewing the net requirements of the batch order, only 400 of the total quantity of 1400 units must be completed today. The production manager must retain the original batch number as the quantity of 400. The original batch number must appear on documentation for the customer.
You need to split the batch order into two orders.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Employees work a half day so that they can attend a company event. You have a rush order that must be completed that same day.
After reviewing the net requirements of the batch order, only 400 of the total quantity of 1400 units must be completed today. The production manager must retain the original batch number as the quantity of 400. The original batch number must appear on documentation for the customer.
You need to split the batch order into two orders.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
正解:
1 - Select the batch order.
2 - Select split button.
3 - Enter 1000 in the split quantity field.
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some questions sets might have more than one correct solutions, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 Supply Chain Management for their Lean manufacturing environment.
There has been an engineering change to a fixed quantity product that is in production. This change will add an additional processing step as the second step. The existing version must be phased out and replaced by the new version.
You need to ensure that the engineering change takes affect at the end of the month.
Solution:
1.) Add a new version to the existing production flow. Set the expiration date to the end of the month.
2.) Create an activity for the new process step and add it in the proper sequence
3.) Create a Kanban rule that incorporates the new activity. Set the expiration date to the end of the month.
4.) Edit the existing Kanban rule. Set the expiration date to the end of the month. Specify the new Kanban rules as the replacement rule Does the solution meet the goal?
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 Supply Chain Management for their Lean manufacturing environment.
There has been an engineering change to a fixed quantity product that is in production. This change will add an additional processing step as the second step. The existing version must be phased out and replaced by the new version.
You need to ensure that the engineering change takes affect at the end of the month.
Solution:
1.) Add a new version to the existing production flow. Set the expiration date to the end of the month.
2.) Create an activity for the new process step and add it in the proper sequence
3.) Create a Kanban rule that incorporates the new activity. Set the expiration date to the end of the month.
4.) Edit the existing Kanban rule. Set the expiration date to the end of the month. Specify the new Kanban rules as the replacement rule Does the solution meet the goal?
正解:B
解答を投票する
You need to resolve the shop supervisor's issue.
Which options should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
Which options should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
正解: