NCSE-Level-1 無料問題集「Nutanix Certified Systems Engineer (NCSE): Level 1」

A prospect is evaluating vSphere alternatives and has received FUD regarding AHV. The SE gives a demo and provides relevant case studies, but the prospect still requests a POC.
What additional option should the SE recommend to avoid a POC?

An SE builds a Sizer scenario for SQL server running on Cisco C240 M4 servers.
Using only the Sizer BOM, which two actions can be performed? (Choose two)

正解:C、D 解答を投票する
From Which page on portal.nutanix.com can an open case be directly escalated?

During a sales motion with a new prospect, the prospect and SE agree to evaluate Nutanix and a computing platform using XRay.
The prospect is currently using 3-tier architecture and considering Nutanix and HPE Simplivity.
Which two details must be discussed with the prospect before the POC starts? (Choose two)

正解:C、D 解答を投票する
An SE is building a solution for a federal goverment prospect that u???
Which two items are required to deliver a solution that meens the ??? encryption (choose two)

正解:A、B 解答を投票する
Refer to the exhibit.
Based on the Sizing scenario, what level of resiliency can be inferred about the configuration?

Which option should be recommended for a customer to get timely notification of significant product issues in the field.

Which two items represent measurable POC success criteria? (Choose two.)

正解:A、B 解答を投票する

弊社を連絡する

我々は12時間以内ですべてのお問い合わせを答えます。

オンラインサポート時間:( UTC+9 ) 9:00-24:00
月曜日から土曜日まで

サポート:現在連絡