NS0-521 無料問題集「Network Appliance Implementation Engineer - SAN ONTAP」
Click the Exhibit button.
A customer is testing a newly installed NetApp AFF A400 all-flash HA storage system. An SVM for FCP with a LUN on Node 1 has been configured, and a server has been connected as shown in the exhibit. For testing, the engineer plans to do a storage failover of Node 1.
After the failover, what is the expected status of the marked path?
A customer is testing a newly installed NetApp AFF A400 all-flash HA storage system. An SVM for FCP with a LUN on Node 1 has been configured, and a server has been connected as shown in the exhibit. For testing, the engineer plans to do a storage failover of Node 1.
After the failover, what is the expected status of the marked path?
正解:D
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)
A customer has data in a LUN on an existing third-party SAN storage system that will be migrated to a new NetApp AFF A400 all-flash MetroCluster system. The host connected to the LUN is a Windows Server 2019 system.
In this scenario, which two methods are supported? (Choose two.)
In this scenario, which two methods are supported? (Choose two.)
正解:A、B
解答を投票する
解説: (JPNTest メンバーにのみ表示されます)